In January 2021 COBA Flooring supplied and installed Plan.a closed construction entrance matting, with Precision Nib dark green inserts at Stafford County Hospital. A walk off mat and 60m2 of secondary entrance matting were also installed, completing the entrance matting zoning system.
This effective zoning system will help to prevent slips and reduce dirt, debris and moisture from transferring onto internal floor coverings.
Installation of the matting was completed over night to reduce disruption at the hospital.