Plan.a Entrance Matting for Heathrow Bus Station

Client: Heathrow Airport
Contractor: Contour Construction
Project: Heathrow Central Bus Station
Location:  Heathrow, UK
Date Installed: May 2019
Product: Plan.a Closed Construction Alba Inserts
Area Covered: 30m2
Application: Replacement of barrier matting at all 4 entrances

before entrance matting after entrance matting

In May 2019 COBA Flooring supplied and installed 30m2 of Plan.a closed construction entrance matting, with Alba inserts at Heathrow Central Bus Station. Four entrances at the bus station were fitted with replacement barrier matting, to effectively wipe moisture and scrape dirt form footwear and wheeled traffic. Well, specified entrance matting helps to protect internal floor coverings and prevent slip hazards.

Installation of the matting was completed over night to reduce disruption at the bus station.

Products Used

bus station entrance matting

Stay Up to Date

Get the latest floor safety articles, product updates and offers.