Main Contractor: Balfour Beatty
Sub Contractor: FAAC Entrance Systems
Project: Dundee Train Station
Product: Plan A 17mm Open Construction PVC Scraper Inserts
Application: 4 Oval revolving doors totalling 30m2
Installer: COBA Flooring
Date of Install: December 2021