The Project
When Excellerate JBI needed matting for the Omnipark project in Paarl, they approached COBA Flooring for a solution that could work across more than just the front door.
The building required matting for three distinct areas: the exterior entrance, the internal entrance and the lift. Each space presented a different requirement, so rather than relying on one product throughout, the project used a combination of matting solutions suited to each location.
PITS in Paarl became the distributor for the project, supplying the selected products.
A Layered Approach to the Main Entrance
The entrance was treated as more than a single matting area.
Super Contract Fall was specified at the exterior main entrance, creating the first line of defence before visitors enter the building. Exterior entrance matting plays an important role in scraping dirt, grit and outdoor debris from footwear before it is carried further inside.
Immediately inside the entrance, Alba in Anthracite provides the next stage of the system.
Alba is designed for high-volume entrance areas and internal walkways, where its nylon pile helps absorb moisture while standing up to repeated foot traffic. COBA Flooring SA also recommends Alba as part of a multi-stage entrance system in heavy-traffic environments.
Together, the two areas create a simple progression:
Outside: remove larger dirt and debris.

Inside: capture remaining moisture and finer contamination.

The result is a more considered entrance rather than asking one mat to do everything.
