We supplied Concept Flooring Supplies with 194 Premier closed construction tiles, which consisted of 152 Premier Track and 42 of Premier Rib. The site survey was completed by COBA Flooring and the entrance matting was installed by Harris Property Maintenance.
Sign up for the latest COBA Flooring news.
Thank you for signing up to our newsletter.